  • Brick making machines are manual and automatic both. If we talk about manual then it controlled by button
  • A block machines need electricity and diesel both, mainly electricity if need diesel then need generator. It will take 300kw diesel to power the generator and 45pc bricks can be loaded on per PVC.
  • This machine produce hollow blocks, solid and brick if you change the mould.
    By this machine 2400 to 4800 brick /blocks can be produce depending on the size of bricks. Although bricks can produce in one shift of 8 hours.
  • The block machine requires 10% water, 20% sand, 64% gravel and 6%fly ash.
  • 1.5-1.8 kg of water will function per block of 400 * 400 * 200 mm, mild water is ok, however no salty water.
  • In cement brick making machine China it is operated by a button on the control panel, you can press blocks and block the machine by a button.
  • The ability of production depends on this forming unit, which is also the integral part of the entire production line.
  • On these sections you can change the moulds to create various shapes of blocks, coloured-paving bricks and curbs.
  • PLC manages the mechanism and it is fitted with remote control system. Typically we use Mitsubishi or Delta for PLC control system.
  • Schneider & CHNT circum disconnectors and insulators.

Advantage of Brick Making Machine

  1. This production line is automated. Simple to use, and money saved.
  2. This machine can serve a range of purposes, and can manufacture hollow blocks, solid blocks, pavement blocks, curbs, river bricks, exposing bricks, grassed bricks, and so on with various moulds.
  3. All procedures are PLC-operated and fitted with an out-and-in date system for person-machine conversations.